AP Advanced Construction

Contact

Get in touch with AP Advanced Construction

By submitting, you agree to be contacted about your request.

Topic

Communication Issues

20% positive

Across 127 reviews of AP Advanced Construction in Jacksonville, FL, communication issues appears in 5 reviews (20% positive), from 2019-10-18 through 2026-05-26.


Key findings

  • Communication Issues mentioned in 5 of 127 reviews (3.9%)

  • 20% of Communication Issues reviews are 4 or 5 stars

  • Average rating in Communication Issues reviews: 2★

Aspects most discussed in these reviews

  • Professionalism & Conduct

    100%5 mentions
  • Problem Resolution & Effectiveness

    80%4 mentions
  • Responsiveness & Speed

    80%4 mentions
  • Communication & Updates

    80%4 mentions
  • Technical Knowledge & Expertise

    60%3 mentions
  • Scheduling & Booking Ease

    40%2 mentions

Reviews mentioning communication issues

February 19, 2025

Sheila Foote

We had three projects done by AP: 1. Master bath- beautiful 2. Guest bath, beautiful. 3. Kitchen, ultimately beautiful. I would have given five stars if we had fewer subcontractor issues. Countertop delivery had to be rescheduled two or three times and finish work for cabinets and baseboards needed correction 2 or 3 times. Details are still not perfect, but we can live with them. AP has stood behind their work and have always responded when we needed corrections.

Response from owner

Hi Sheila, Thank you so much for sharing your feedback! We're thrilled to hear that you love your master bath, guest bath, and kitchen. We sincerely apologize for the delays along the way. We're glad to know that we were able to address your concerns and make the necessary corrections. Thanks again for your trust in AP, and we hope you enjoy your newly updated spaces!

February 19, 2025

June 20, 2024

Sara Aton

We used this company for a partial remodel of our master bathroom. Although the end product is nice, the process of getting there was very disappointing. The backsplash was the same thickness as the countertop (1 1/8 inch) and needed to be milled down to fit behind the new sink hardware. We ordered a countertop with rectangular basins; the countertop was delivered with oval basins. The tower top cabinet door was the wrong color and had to be reordered. Tower side panels were delivered with scratches and had to be reordered. The trim kit to change out shower hardware had to go through three changes to fit existing shower hardware. All these mistakes added more time to finish what should have been a fairly straightforward vanity replacement. Communication from AP Advanced with us during the process was sporadic and not very timely. We would not use AP Advanced again.

December 5, 2023

Judy Murphy

Not even sure where to start with this company. Started off well. Ben was great at selling us on the company then went mia. This project started in the beginning of November. A small bathroom that probably could have been done in a week. The first project manager told me that a what I was asking for was a lot of work. I left the room so I didn’t respond. A lot of work? I’m paying 14k for shower in a small bathroom. Then he was having a conversation with a gentleman who was interpreting for the workers who spoke no English. That got heated and loud. After a couple more incidents with that project manager we decided that relationship was not working out. So, we were put on ice for a week and then got a new project manager who returned with same crew. Again, with language barrier things weren’t getting done properly. Again, another week we get put on ice. Then project manager comes by with an another contractor who was able to communicate and decided that there was a lot that needed to be redone. That was last Monday one week ago. Haven’t seen him or received any messages when he is coming back. My suggestion would be if you want any work done with this outfit expect construction indefinitely. Will update if when project ever gets done.

March 10, 2023

Scott Stocklin

They came out to discuss the project. Per our conversation I wanted a cost breakdown and itemization. They provided a quote ok a crazy amount and did not provide a breakdown as requested. Replied with the ask for the complete breakdown and never heard from them again. Either they do t know how to do the work, too lazy to do the work , or they don't want my business. Wasted my time....wil not chase them down. You want the work or you don't.

Response from owner

We're sorry that we can't provide you with a break down on pricing but, at AP and many other companies alike, we offer "complete package pricing" we are transparent, we pride ourselves in the fact that we take the time to provide a very comprehensive proposal to our customers. In regard to a break down , our proposals have a complete break down of the scope of work. This helps the customer to understand and be clear on exactly what is getting done, who's proving what and what materials & labor we are providing. We constantly do our research and make sure that we are competitive and that we are staying in line with our competitors. . We would love to move forward with you if you feel that you might want to do so with this in mind.

March 13, 2023

May 24, 2021

Barb Douris

The amount of time and money I had to put into my bathroom remodel to FIX all their work is inexcusable. I would love to attach pictures of how they left my bathroom as “finished” but I can’t figure out how to add them. They also removed insulation from my exterior wall and never replaced it before putting sheetrock up. Besides the work being subpar, I’d call multiple times with no return calls. Their communication is nonexistent and when you point out a mistake or miscommunication you are put off or completely ignored. When you point out, to two separate people, that building codes have not been met they do nothing. No apology, no “we’ll look into this and fix it”. Nothing.

Response from owner

Dear Barb, thanks for sharing your feedback. AP Advanced team follows a standard redesign process for all remodeling jobs. If there is something wrong, you should mention it, so we can fix it without delaying the job. Please feel free to reach out to us.

June 9, 2021